1. About Logistics:
DAP channel generally takes 5-9 working days, and DHL / UPS / FedEx, etc. are selected; DDP (including tax payment) channels generally take 12-15 working days. The freight forwarding line arrives in your country and then transported by local express.
2. About products:
all our products cooperate with manufacturers, and these manufacturers are very reliable. Products are popular, and most products have CE certificates.
3. About delivery time:
Generally speaking, we have stock and can deliver goods quickly (within 1-3 days). DIY products, such as battery box, bus bar, insulating board, etc., are generally customized within 3-7 days;
4. What services can we provide?
Accepted delivery terms: FOB/DAP;
Accepted payment currencies: U.S. dollars, RMB;
Acceptedpayment types: T/T, L/C;
5. After sales service:
if you encounter problems in the process of using our products, or consult about installation and other problems, please contact us.
Email: jyaaa_
[email protected] /
Wechat / Tel. / WhatsApp: + 86-18038282287